BeCOMS® – Commissioning

A proper cabling between SRE, Evaluator and PC is required to achieve an interference-free signal transmission and thus for the function of the BeCOMS® system.

To ensure this, the following Pre-Commissioning-Checks must be done.
 

Nach oben scrollen